Spools of fresh, raw Mogami cable ready for builds 
Bulk plugs selected 
Components for the cable build 
Pre-tin the plug with solder 
Check to make sure flow is even 
Insert Techflex polymer sleeving 
expose precise amount of shielding for hand twisting 
Pre-tin hand twisted wires (note separation of anti static shield on the right) 
Solder in place 
Visual Inspection 
Clamp, hot glue and adhesive-lined thick wall heat-shrink tubing added 
While hot glue is still setting, use clamp to tighten the barrel over insulating tab 
The other side’s wires are pre tinned as are the terminals of the plug 
After soldering the cable to the terminals a visual inspection is made 
Testing is done to make sure everything is fine before plug is secured 
Clamp, hot glue and adhesive-lined thick wall heat-shrink tubing added for stability 
Insulating tube covers assembly before barrel installed 
While hot glue is still setting, use clamp to tighten the barrel 
Final electrical test 
Custom rugged Riptie brand cable fastener installed 
Cable coiled in “figure 8” fashion 
Cable ready for shipment